Site Overlay

Dredge – Frederick Paup

Dredge | Frederick Paup

Manson Construction’s 419’-10” x 81’ Trailing Suction Hopper Dredge

Scheduled to begin service in late 2024, the FREDERICK PAUP will be the largest US-flagged, self-propelled hopper dredge delivered in American shipbuilding history. The FREDERICK PAUP boasts a hopper capacity of over 15,000 cubic yards, surpassing her predecessors by volume, the ELLIS ISLAND and GLENN EDWARDS. The vessel is currently under construction at the Seatrium AmFELS shipyard in Brownville, Texas and will receive ABS ✠A1, ✠AMS, and ACCU class notations as well as SOLAS certification once completed. The FREDERICK PAUP will be propelled by (3) stern Z-drive units and has (2) bow thrusters forward.

For more information see the following articles:

link to video of hopper dredge FREDERICK PAUP
VIDEO: Transfer of Manson Hopper Dredge FREDERICK PAUP, Seatrium AmFELS - Brownsville, TX
419’-10” x 81’ Trailing Suction Hopper Dredge Frederick Paup drawing